Tuesday, July 6, 2010

Waiting for the Floor

The inspector approved the footing, the down slope wall has been braced to prevent blowout, a chunnel has been dug under the street side of the house for the chute that will deliver the concrete,... and Kallan and Reece are ready to etch memories.

Saturday, June 12, 2010

Tuesday, June 8, 2010

Mummified "Deer" Skull: An Artifact from Under the Pearl

 

LL sans Floor

The beams under the lower level were in direct contact with the dirt foundation and rotted as a consequence. The floor was removed to dig out the dirt, place footings, and replace the beams. We are now looking into permits and pricing to pour a concrete foundation. This work is being done by a contractor (Tim), who has also been hired to close up the old stairwell and finish the cathedral ceiling.

No More Stairs

 

Monday, May 24, 2010

Saturday, May 22, 2010

3 Rooms become 1

The doors into the exterior bathroom and the workshop finally lead directly into the house.

Reclaiming Floor Boards

Some of the walls in the lower level were constructed of tongue and groove floor boards, which might be useful to patch other areas of the house.