Waiting for the Floor
The inspector approved the footing, the down slope wall has been braced to prevent blowout, a chunnel has been dug under the street side of the house for the chute that will deliver the concrete,... and Kallan and Reece are ready to etch memories.
Tuesday, June 29, 2010
Saturday, June 12, 2010
Tuesday, June 8, 2010
LL sans Floor
The beams under the lower level were in direct contact with the dirt foundation and rotted as a consequence. The floor was removed to dig out the dirt, place footings, and replace the beams. We are now looking into permits and pricing to pour a concrete foundation. This work is being done by a contractor (Tim), who has also been hired to close up the old stairwell and finish the cathedral ceiling.
Wednesday, June 2, 2010
Monday, May 24, 2010
Saturday, May 22, 2010
Reclaiming Floor Boards
Some of the walls in the lower level were constructed of tongue and groove floor boards, which might be useful to patch other areas of the house.